Send us plans, a finish schedule, or a lot list. We'll review the materials with you across flooring, tile, stone, and slab counters, and confirm availability and pricing in a written quote.
Northern Lights Design is a specialty materials supplier — we don't perform installation or fabrication. We work with any installer you choose, and we're happy to recommend installers we know.
What Builders & Designers Can Count On
Lead times confirmed in writing
Before you commit a date to a client, we confirm current availability in writing. Slab, imported porcelain, and special-order hardwood get flagged early so your schedule holds.
Substitutions handled early
We review the specified product for availability, then propose alternates where the spec is unavailable, back-ordered, or wrong for the exposure. Every alternate comes with the data behind it.
Freight planned to the site
Quoted delivery based on quantity, access, offload equipment, and required date, with written receiving instructions for count, inspection, and reporting damage.
Acclimation requirements sent with the order
Subfloor condition, moisture, and acclimation are install-side conditions, but manufacturer warranties reference them, so we send the requirements with the order even though the install is not ours.
Selections kept on file
Your selections and quantities stay on file, so reorders and matching material for the next phase or the next house start from what you already chose.
One point of contact
Work with one person who knows your projects, so you are not re-explaining the job on every call. Questions answered by phone or email.
Every Builder & Designer Resource in One Place
We offer complimentary measuring for projects in our service area. See our service area. We work with any installer you choose, and we're happy to recommend installers we know.
Start an account
- Open a builder or designer account
Opens the contact form with the builder or designer account topic selected.
- Trade program
How trade accounts work and what we confirm with you in writing.
- General contractor pathway
Written lead times, substitutions and full material packages.
- Interior designer pathway
Finish schedules, samples and selections kept on file.
Plan and spec
- How our process works
From first conversation to delivery, step by step.
- Request samples
Compare products in project lighting before you specify.
- Waste factor calculator
Starting-point overage for flooring layouts.
- Tile calculator
Square feet, tile count and boxes.
- Brand directory
Every line we carry across flooring, tile and countertops.
- Countertops through our partners
We have strategic partnerships with countertop suppliers and fabricators, including butcher block and soapstone.
- Comparison guides
Side-by-side material comparisons for client conversations.
- Builder's guide to selection timelines
When to lock selections so orders land on schedule.
Order and deliver
- Freight and receiving checklist
Count, inspect and report damage at delivery.
- Pro supplies
Setting materials, grout, levelers and spacers.
- Sundry Pro Shop will-call
Pickup counter at our Columbia Falls warehouse.
- Regional project delivery
Flooring and tile for projects outside the Flathead Valley, with terms in your written quote.
- Multifamily and commercial flooring
Repeat packages and phased delivery.
Install and finish
- Complimentary measuring
We offer complimentary measuring for projects in our service area.
- Installer recommendations
We work with any installer you choose, and we're happy to recommend installers we know.
- Stains, sealers and topcoats
Bona, Loba, Rubio Monocoat and Miracle 511 finish systems.
- Tread Space stair treads
Stair treads made from your clients' flooring.
Proof
- Project case studies
Completed residential and commercial work across Northwest Montana.
- Warranty structure
Who covers what between manufacturer, supplier and installer.
Six Allowance Mistakes That Become Change Orders
These are the finish-stage disputes we watch play out most often on Flathead Valley builds — and how to write the allowance so they don't.
Allowance quoted as material-only, sold as installed
Write allowances as material + freight + delivery, and state clearly that labor, subfloor prep, and demo are separate. This single line prevents most finish-stage disputes.
Waste factor omitted
Plan 7–10% on straight-lay plank, 12–15% on diagonal or herringbone patterns, and more on small, cut-heavy rooms. An allowance built on net square footage is short before it starts.
Trim, transitions, and stair parts forgotten
Stair noses, reducers, T-molds, and shoe can add meaningfully to a whole-home package — especially with special-order or color-matched components that carry their own lead time.
Setting materials and underlayment unbudgeted
Thinset, membrane, grout, sealer, sound underlayment, and moisture barrier are real line items. On a tile-heavy house they're not a rounding error.
No ordering deadline in the schedule
Back-date the order from the install date using the confirmed lead time, not the optimistic one. We flag deadlines for slab, imported porcelain, and special-order wood.
Client upgrades handled verbally
Every upgrade should generate a written material delta against the allowance before the order is placed. We'll issue the revised material quote so your change order is documented.
Where to Go From Here
Browse the full brand and specification directory, stock up at the Sundry Pro Shop counter in Columbia Falls, review our warranty structure, or see completed project case studies. Working as a general contractor sourcing a full material package or an interior designer building a finish schedule? Those pathways go deeper on documentation, freight, and specification. Specifying for a hotel, restaurant, or multifamily property instead? Start with our commercial pathway.